One of the practical concerns homeowners have about any driveway project is disruption. How long will the drive be out of use? How many days will there be vehicles and workers outside? Here's an honest breakdown.
Typical Installation Timeline
Day 1: Groundworks (if required)
For a new installation where the existing surface needs to be removed:Duration: 1 day for a typical residential driveway (up to 60m²). Larger or more complex projects may take 2 days.
Day 2: Resin Installation
Duration: Half a day to a full day depending on area.
After Installation: Curing
If Overlaying an Existing Surface
- If your existing concrete base is sound and we can overlay directly:
- The groundworks phase is significantly reduced or eliminated
- The entire installation (surface preparation + resin) can often be completed in a single day
What Affects the Timeline?
Will I Have Access During the Work?
We try to maintain pedestrian access throughout where possible. For the resin installation phase itself, the area is closed for the day. Vehicle access returns within 24 hours.
Booking and Lead Times
We currently have a lead time of approximately 2–4 weeks for new installations across Yorkshire and the North West. Contact us to check availability.